11
TITLE: Implementing slot-based task-splitting multiprocessor scheduling
AUTHORS: Sousa, PB; Andersson, B; Tovar, E ;
PUBLISHED: 2011, SOURCE: 6th IEEE International Symposium on Industrial Embedded Systems, SIES 2011 in SIES 2011 - 6th IEEE International Symposium on Industrial Embedded Systems, Conference Proceedings
INDEXED IN: Scopus DBLP CrossRef
IN MY: ORCID
12
TITLE: Practical Aspects of Slot-Based Task-Splitting Dispatching in its Schedulability Analysis
AUTHORS: Paulo Baltarejo Sousa; Konstantinos Bletsas ; Bjorn Andersson; Eduardo Tovar ;
PUBLISHED: 2011, SOURCE: 1st International Workshop on Cyber-Physical Systems, Networks, and Applications (CPSNA) held during 17th IEEE International Conference on Embedded and Real-Time Computing Systems and Applications (RTCSA) in 2011 IEEE 17TH INTERNATIONAL CONFERENCE ON EMBEDDED AND REAL-TIME COMPUTING SYSTEMS AND APPLICATIONS (RTCSA 2011), VOL 1, VOLUME: 1
INDEXED IN: Scopus WOS DBLP CrossRef
IN MY: ORCID
13
TITLE: RAVE: Replicated antivirus engine
AUTHORS: Silva, C; Sousa, P; Verissimo, P ;
PUBLISHED: 2010, SOURCE: 2010 International Conference on Dependable Systems and Networks Workshops, DSN-W 2010 in Proceedings of the International Conference on Dependable Systems and Networks
INDEXED IN: Scopus DBLP CrossRef: 5
15
TITLE: Hybrid wired/wireless PROFIBUS architectures: Comparative performance analysis in an error-prone environment
AUTHORS: Sousa, PB; Ferreira, LL ;
PUBLISHED: 2007, SOURCE: 7th IFAC International Conference on Fieldbuses and Networks in Industrial and Embedded Systems, FeT'2007 in IFAC Proceedings Volumes (IFAC-PapersOnline), VOLUME: 7, ISSUE: PART 1
INDEXED IN: Scopus
IN MY: ORCID
16
TITLE: Agent-based approach for manufacturing
AUTHORS: Paulo Sousa; Carlos Ramos ; Jose Neves ;
PUBLISHED: 2005, SOURCE: 9th World Multi-Conference on Systemics, Cybernetics and Informatics in WMSCI 2005: 9th World Multi-Conference on Systemics, Cybernetics and Informatics, Vol 4, VOLUME: 4
INDEXED IN: Scopus WOS
17
TITLE: The Fabricare scheduling prototype suite: Agent interaction and knowledge base  Full Text
AUTHORS: Sousa, P; Ramos, C ; Neves, J ;
PUBLISHED: 2003, SOURCE: International Workshop on Agent-Based Manufacturing Process Planning and Scheduling held at the 3rd World Manufacturing Congrss in JOURNAL OF INTELLIGENT MANUFACTURING, VOLUME: 14, ISSUE: 5
INDEXED IN: Scopus WOS CrossRef: 10
18
TITLE: A distributed architecture and negotiation protocol for scheduling in manufacturing systems  Full Text
AUTHORS: Sousa, P; Ramos, C ;
PUBLISHED: 1999, SOURCE: COMPUTERS IN INDUSTRY, VOLUME: 38, ISSUE: 2
INDEXED IN: Scopus WOS CrossRef
19
TITLE: Proposal for a dynamic scheduling architecture and method using an holonic approach
AUTHORS: Silva, N ; Sousa, P; Ramos, C;
PUBLISHED: 1999, SOURCE: 5th IFAC Workshop on Intelligent Manufacturing Systems (IMS 98) in INTELLIGENT MANUFACTURING SYSTEMS 1998 (IMS'98)
INDEXED IN: WOS
20
TITLE: A dynamic scheduling holon for manufacturing orders  Full Text
AUTHORS: Sousa, P; Ramos, C ;
PUBLISHED: 1998, SOURCE: 2nd World Congress on Intelligent Manufacturing Processes and Systems in JOURNAL OF INTELLIGENT MANUFACTURING, VOLUME: 9, ISSUE: 2
INDEXED IN: Scopus WOS CrossRef: 44
Page 2 of 2. Total results: 20.