61
TITLE: AN EVOLUTIONARY ALGORITHM WITH ACTIVE PLANS FOR THE RCPSP
AUTHORS: Jose A Oliveira; Luis S Dias; Guilherme Pereira;
PUBLISHED: 2011, SOURCE: 17th European Concurrent Engineering Conference (ECEC 2011) / 7th Future Business Technology Conference (FUBUTEC 2011) in ECEC' 2011:17TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE / 7TH FUTURE BUSINESS TECHNOLOGY CONFERENCE
INDEXED IN: WOS
62
TITLE: SIMULATION OF A MILK RUN MATERIAL TRANSPORTATION SYSTEM IN THE SEMICONDUCTORS INDUSTRY
AUTHORS: Ricardo Raposo; Guilherme Pereira; Luis Dias;
PUBLISHED: 2009, SOURCE: 7th International Industrial Simulation Conference in 7TH INDUSTRIAL SIMULATION CONFERENCE 2009
INDEXED IN: Scopus WOS
63
TITLE: Teaching simulation basics through flowchart simulation the Event Scheduling World View
AUTHORS: Pereira, GAB; Dias, LMS; Rocha, HTC;
PUBLISHED: 2009, SOURCE: 8th International Workshop on Modeling and Applied Simulation, MAS 2009, Held at the International Mediterranean and Latin American Modeling Multiconference, I3M 2009 in International Workshop on Modeling and Applied Simulation, MAS 2009, Held at the International Mediterranean and Latin American Modeling Multiconference, I3M 2009
INDEXED IN: Scopus
IN MY: ORCID
64
TITLE: SOFTWARE TOOLS INTEGRATION FOR THE DESIGN OF MANUFACTURING SYSTEMS
AUTHORS: Pavel Vik; Guilherme Pereira; Luis Dias;
PUBLISHED: 2009, SOURCE: 7th International Industrial Simulation Conference in 7TH INDUSTRIAL SIMULATION CONFERENCE 2009
INDEXED IN: Scopus WOS
65
TITLE: A linear programming model for the storage location assignment problem - A case study
AUTHORS: Carla Geraldes; Sameiro Carvalho; Guilherme Pereira;
PUBLISHED: 2008, SOURCE: 15th European Concurrent Engineering Conference (ECEC 2008)/5th Future Business Technology Conference (FUBUTEC 2008) in 15TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE/5TH FUTURE BUSINESS TECHNOLOGY CONFERENCE
INDEXED IN: WOS
66
TITLE: Heuristic approach as a way to improve scheduling in ERP/APS systems
AUTHORS: Frantisek Koblasa; Luis S Dias; Jose A Oliveira ; Guilherme Pereira;
PUBLISHED: 2008, SOURCE: 15th European Concurrent Engineering Conference (ECEC 2008)/5th Future Business Technology Conference (FUBUTEC 2008) in 15TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE/5TH FUTURE BUSINESS TECHNOLOGY CONFERENCE
INDEXED IN: WOS
67
TITLE: Using 3D simulation in an industry internal logistic process
AUTHORS: Vik Pavel; Luis S Dias; Jose A Oliveira ; Guilherme Pereira;
PUBLISHED: 2008, SOURCE: 15th European Concurrent Engineering Conference (ECEC 2008)/5th Future Business Technology Conference (FUBUTEC 2008) in 15TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE/5TH FUTURE BUSINESS TECHNOLOGY CONFERENCE
INDEXED IN: WOS
68
TITLE: Failure rate of a repairable system under periodic overhauls
AUTHORS: Lopes, IS; Leitao, AF ; Pereira, GAB;
PUBLISHED: 2008, SOURCE: 5th International Conference on Quality and Reliability, ICQR 2007 in ICQR 2007 - Proceedings of the 5th International Conference on Quality and Reliability
INDEXED IN: Scopus
IN MY: ORCID
69
TITLE: A linear programming model for the storage location assignment problem - A case study
AUTHORS: Geraldes, C; Carvalho, S; Pereira, G;
PUBLISHED: 2008, SOURCE: 15th European Concurrent Engineering Conference, ECEC 2008 and 5th Future Business Technology Conference, FUBUTEC 2008 in 15th European Concurrent Engineering Conference 2008, ECEC 2008 - 5th Future Business Technology Conference, FUBUTEC 2008
INDEXED IN: Scopus
70
TITLE: Using 3D simulation in an industry internal logistic process
AUTHORS: Pavel, V; Dias, LS; Oliveira, JA; Pereira, G;
PUBLISHED: 2008, SOURCE: 15th European Concurrent Engineering Conference, ECEC 2008 and 5th Future Business Technology Conference, FUBUTEC 2008 in 15th European Concurrent Engineering Conference 2008, ECEC 2008 - 5th Future Business Technology Conference, FUBUTEC 2008
INDEXED IN: Scopus
Page 7 of 8. Total results: 72.