21
TITLE: Principles and Practices of Lean Production applied in a Metal Structures Production System
AUTHORS: Carvalho, R; Alves, A; Lopes, I;
PUBLISHED: 2011, SOURCE: World Congress on Engineering (WCE 2011) in WORLD CONGRESS ON ENGINEERING, WCE 2011, VOL I
INDEXED IN: WOS
22
TITLE: Improvement of Scrap Request Process with Six Sigma Methodology
AUTHORS: Ferreira, JE; Lopes, IS;
PUBLISHED: 2010, SOURCE: World Congress on Engineering (WCE 2010) in WORLD CONGRESS ON ENGINEERING, WCE 2010, VOL III
INDEXED IN: WOS
23
TITLE: Workplace occupation and equipment availability and utilization, in the context of maintenance float systems
AUTHORS: Lopes, IS; Leitao, AF ; Pereira, GAB ;
PUBLISHED: 2009, SOURCE: European Safety and Reliability Conference (ESREL)/17th Annual Meeting of the Society-for-Risk-Analysis-Europe (SRA-Europe) in SAFETY, RELIABILITY AND RISK ANALYSIS: THEORY, METHODS AND APPLICATIONS, VOLS 1-4, VOLUME: 1
INDEXED IN: Scopus WOS
24
TITLE: State probabilities of a float system
AUTHORS: Lopes, IS; Leito, ALF ; Pereira, GAB ;
PUBLISHED: 2007, SOURCE: Journal of Quality in Maintenance Engineering, VOLUME: 13, ISSUE: 1
INDEXED IN: Scopus CrossRef: 1
25
TITLE: A maintenance float system with periodic overhauls
AUTHORS: Lopes, IS; Leitao, ALF ; Pereira, GAB ;
PUBLISHED: 2006, SOURCE: European Safety and Reliability Conference (ESREL 2006) in Safety and Reliability for Managing Risk, Vols 1-3, VOLUME: 1
INDEXED IN: Scopus WOS
Page 3 of 3. Total results: 25.