21
TITLE: Stochastic versus Fuzzy Models-A Discussion Centered on the Reliability of an Electrical Power Supply System in a Large European Hospital  Full Text
AUTHORS: Pinto, CA; Farinha, JT ; Raposo, H ; Galar, D;
PUBLISHED: 2022, SOURCE: Energies in ENERGIES, VOLUME: 15, ISSUE: 3
INDEXED IN: Scopus WOS CrossRef: 5 Handle
22
TITLE: An integrated model for dimensioning the reserve fleet based on the maintenance policy
AUTHORS: Raposo, H ; Farinha, JT; Pais, E; Galar, D;
PUBLISHED: 2021, SOURCE: WSEAS Transactions on Systems and Control, VOLUME: 16
INDEXED IN: Scopus CrossRef: 6
23
TITLE: Increasing the Reliability of an Electrical Power System in a Big European Hospital through the Petri Nets and Fuzzy Inference System Mamdani Modelling
AUTHORS: Pinto, CA; Farinha, JT ; Singh, S; Raposo, H ;
PUBLISHED: 2021, SOURCE: Applied Sciences in APPLIED SCIENCES-BASEL, VOLUME: 11, ISSUE: 6
INDEXED IN: Scopus WOS CrossRef: 4 Handle
24
TITLE: Optimizing the Life Cycle of Physical Assets through an Integrated Life Cycle Assessment Method  Full Text
AUTHORS: Pais, S.; Raposo, HDN ; Farinha, JT ; Cardoso, AJM; Marques, PA;
PUBLISHED: 2021, SOURCE: Energies in ENERGIES, VOLUME: 14, ISSUE: 19
INDEXED IN: Scopus WOS CrossRef: 16 Handle
25
TITLE: Work–family conflict and firefighters’ satisfaction with life: The autonomous motivation role
AUTHORS: Daniel Dominguez, MSc, CICPSI; Maria José Chambel, PhD ; Rui Pedro Ângelo, PhD ; Hugo Raposo, PhD ;
PUBLISHED: 2021, SOURCE: Journal of Emergency Management, VOLUME: 19, ISSUE: 3
INDEXED IN: CrossRef: 3
26
TITLE: ISO 55001-A PRAGMATIC PROPOSAL FOR DIAGNOSIS AND IMPLEMENTATION
AUTHORS: Pais, E; Farinha, JT; Raposo, H ;
PUBLISHED: 2020, SOURCE: 7TH INTERNATIONAL CONFERENCE INTEGRITY-RELIABILITY-FAILURE (IRF2020)
INDEXED IN: WOS
27
TITLE: Life cycle cost versus life cycle investment – a new approach
AUTHORS: José Torres Farinha ; Hugo Nogueira Raposo ; Diego Galar;
PUBLISHED: 2020, SOURCE: WSEAS Transactions on Systems and Control, VOLUME: 15
INDEXED IN: Scopus CrossRef: 8
28
TITLE: Optimizing the life cycle of physical assets – A review
AUTHORS: Pais, E; Farinha, JT ; Cardoso, AJM; Raposo, H ;
PUBLISHED: 2020, SOURCE: WSEAS Transactions on Systems and Control, VOLUME: 15
INDEXED IN: Scopus CrossRef: 11
29
TITLE: Condition Monitoring with Prediction Based on Diesel Engine Oil Analysis: A Case Study for Urban Buses
AUTHORS: Raposo, H ; Farinha, JT ; Inácio Fonseca ; Ferreira, LA ;
PUBLISHED: 2019, SOURCE: Actuators in ACTUATORS, VOLUME: 8, ISSUE: 1
INDEXED IN: Scopus WOS CrossRef: 45 Handle
30
TITLE: Economic Life Cycle <i>versus</i> Lifespan – A Case Study of an Urban Bus Fleet
AUTHORS: Hugo Raposo ;
PUBLISHED: 2019, SOURCE: Engineering and Applied Sciences, VOLUME: 4, ISSUE: 2
INDEXED IN: CrossRef: 3
Page 3 of 5. Total results: 45.