Maria Sameiro Faria Brandao Soares Carvalho
AuthID: R-000-CHW
111
TÃTULO: Definition of a logistics model in the construction industry- Case study
AUTORES: Pinho, T; Telhada, J; Carvalho, MS;
PUBLICAÇÃO: 2008, FONTE: 15th European Concurrent Engineering Conference, ECEC 2008 and 5th Future Business Technology Conference, FUBUTEC 2008 in 15th European Concurrent Engineering Conference 2008, ECEC 2008 - 5th Future Business Technology Conference, FUBUTEC 2008
AUTORES: Pinho, T; Telhada, J; Carvalho, MS;
PUBLICAÇÃO: 2008, FONTE: 15th European Concurrent Engineering Conference, ECEC 2008 and 5th Future Business Technology Conference, FUBUTEC 2008 in 15th European Concurrent Engineering Conference 2008, ECEC 2008 - 5th Future Business Technology Conference, FUBUTEC 2008
INDEXADO EM:
Scopus

NO MEU:
ORCID

112
TÃTULO: Multiproduct multistage production scheduling (MMPS) for manufacturing systems Full Text
AUTORES: Carvalho, MF; Fernandes, CAO; Ferreira, PAV;
PUBLICAÇÃO: 1999, FONTE: Production Planning and Control, VOLUME: 10, NÚMERO: 7
AUTORES: Carvalho, MF; Fernandes, CAO; Ferreira, PAV;
PUBLICAÇÃO: 1999, FONTE: Production Planning and Control, VOLUME: 10, NÚMERO: 7
113
TÃTULO: The kinetics and mechanism of polyethylene photo‐oxidation
AUTORES: Cruz‐Pinto, JJC; Carvalho, MES; Ferreira, JFA;
PUBLICAÇÃO: 1994, FONTE: Die Angewandte Makromolekulare Chemie, VOLUME: 216, NÚMERO: 1
AUTORES: Cruz‐Pinto, JJC; Carvalho, MES; Ferreira, JFA;
PUBLICAÇÃO: 1994, FONTE: Die Angewandte Makromolekulare Chemie, VOLUME: 216, NÚMERO: 1
INDEXADO EM:
Scopus
